Overview

We were appointed by Just Padel Bolton to prepare an existing factory floor for the installation of eight panoramic Portico padel courts, transforming an industrial building into a premium indoor padel facility.

Although the building provided an ideal location, the existing concrete floor required extensive preparation before it was suitable for a precision sports installation. The slab contained numerous high spots, low spots and cracks, all of which had to be rectified to achieve the strict tolerances required for professional padel courts.

Our team spent over two weeks carefully surveying and preparing the floor. The works included grinding down high spots, repairing and filling cracks, and levelling the surface to create a smooth, stable and accurate base ready for the court installation. Every stage of the process was carried out with precision, ensuring the finished floor met the exact standards required for eight panoramic Portico courts.

Once the preparation works were complete, the site was ready for the installation of the courts, creating a fantastic indoor venue that allows year-round play regardless of the weather.

Working with Just Padel Bolton was a pleasure from start to finish, and we are proud to have played a key role in delivering one of the region’s premier indoor padel facilities.

This project highlights our expertise in specialist floor preparation and demonstrates that we can successfully transform existing industrial buildings into first-class indoor padel venues through careful planning, precision workmanship and attention to detail.

Project Information

Client Icon
Client
Just Padel
Location Icon
Location
Bolton
Date Icon
Date